Inadequate delivery pressure or defective components
operations can generally be traced to leakage, blocked
lines, or the buildup of moisture and sediment in the
system. A regular program of preventive maintenance
is an essential part of air system operation. The mate-
rials presented here are listed in accordance with the
MAINTENACE CHECK LIST in this section. Consider-
ation of severe working conditions may dictate a revi-
sion in schedule periodic checks.
DAILY:
AIR TANKS Open the air tank drain cocks at least
once daily to blow out moisture and accumulated sed-
iment. The drain cocks are located on the frame rail by
the battery box.
WEEKLY:
AIR SYSTEM SAFTY VALVE Manually actuate the air
system safety relief valve by pushing in on the stem.
This will ensure that the valve is not sticking. If the
valve cannot be actuated in this manner, it should be
repaired or replaced
MAINTENANCE AND LUBRICATION
AIR SYSTEM MAINTENANCE
SAFETY VALVE
RIGHT SIDE
AIR TANK
4 - 14 Revised: March 2005RT700 Series