EasyManuals Logo

Terex TC29 User Manual

Terex TC29
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #95 background imageLoading...
Page #95 background image
DELIVERY AND HANDING-OVER INSTRUCTIONS
The following checklist is to be adhered to when handing over the machine
to the customer:
1. Operating instructions
The operating instructions should be read side by side, and be explained in
detail through practical training on the machine.
The following items are of special importance:
Regulations for preventing accidents published by the employer’s
liability insurance associations in the user’s country
Technical data
Operator controls, control and warning indicators
Checks before putting the machine into operation
Specifications for diesel engine start-up
Switching on and off the diesel engine
Explanation of hydrostatic crawler drive
Travel operation
Recovery and transport of the machine
Operation of all functions
Tensioning the crawler chains
Explanation of maintenance and inspection intervals according to
Maintenance and Inspection Plan by demonstrating maintenance points
on machine
Lubrication intervals and points of lubrication according to overview of
lubricating points and demonstration of these points on the machine
Handing over the diesel engine operating instructions
2. Spare parts list
Structure of spare parts list, of figures and the respective descriptions
Instructions for ordering spare parts: always state the type of machine,
the vehicle identification number (Fz-Id.Nr.), parts designation, complete
spare part number, piece number, delivery address, etc.
3. Warranty
Explanation of warranty covered by manufacturer
Explanation of inspection cards and note on maintenance and
inspection plan
The warranty/ handing-over card must be filled out correctly and sent
back
Crawler Excavator
TC29
Maintenance and Inspection Plan
The careful performance of all prescribed inspections is the best prerequisite
for the machine’s continuous readiness for operation.
All maintenance work mentioned should therefore be performed in the
prescribed sequence with the machine at operating temperature.
The inspections are obligatory.
If omitted, the warranty covered by us may be subject to restrictions.
The machine must be thoroughly cleaned before inspection takes place.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Terex TC29 and is the answer not in the manual?

Terex TC29 Specifications

General IconGeneral
BrandTerex
ModelTC29
CategoryExcavators
LanguageEnglish

Related product manuals