ACKF01_GB_00 TEXA S.p.A. 101/122
6.8 After-flushing recommendations
After having performed a system flushing we are recommending the following steps:
¾ Replace all O-rings of the system
¾ Replace the receiver drier or accumulator
¾ Drain and replace the compressor oil
¾ Reassemble the complete A/C system
¾ Pressurize the system with nitrogen and check for leakages
¾ Bring the system to deep vacuum to remove all moisture
¾ Inject UV additive in prevention for detecting leakage
¾ Recharge lubricant and refrigerant within manufacturer specifications
¾ Verify proper functioning of the system. (Noise, pressure, performances, leak check…)