EasyManua.ls Logo

Toro Workman 07390 - CVT-Intake Duct Connection; Brake Burnishing Procedure

Toro Workman 07390
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
ConnectingtheCVT-Intake
Duct
NoPartsRequired
Procedure
Important:Removetheplasticbagcoveringthe
endoftheCVTductbeforestartingtheengine.
TheCVTKit(PartNo.121-9853)andAdapterKit
(PartNo.127-8750)arerequiredforthisprocedure.
1.Loosenthehoseclampsecuringtheplasticbag
attheendoftheCVT-intakehoseandremove
thebag.
2.Raisethecargobedbyperformingthefollowing:
A.Engagetheparkingbrake.
B.Starttheengine.
C.Movethehydraulic-liftleverrearwardto
raisethecargobox.
D.Shutofftheengine.
E.Removethebedsupportfromthestorage
bracketsonthebackoftheROPSpanel
andinstallthesupportontothecylinderrod
ofthebed-liftcylinder;refertoUsingthe
BedSupport(page35).
3.AligntheCVT-intakehoseontotheintake-tube
connectoratthebacksideoftheROPSpanel
andtightenthehoseclamp(Figure7).
g026251
Figure7
1.CVT-intakehose
3.Intake-tubeconnector
2.Hoseclamp
4.Removethebedsupport,lowerthebed,shutoff
theengine,andremovethekey.
6
BurnishingtheBrakes
NoPartsRequired
Procedure
Toensureoptimumperformanceofthebrakesystem,
burnishthebrakesbeforeuse.
1.Bringthemachineuptofullspeed,applythe
brakestorapidlystopthemachinewithout
lockingupthetires.
2.Repeatthisprocedure10times,waiting1minute
betweenstops,toavoidoverheatingthebrakes.
Important:Thisprocedureismosteffective
ifthemachineisloadedwith454kg(1,000
lb).
14

Table of Contents

Related product manuals