Pre-Maintenance
Procedures
PreparingtheMachinefor
Maintenance
1.Parkthemachineonalevelsurface.
2.Engagetheparkingbrake.
3.Emptyandraisethecargobed;refertoRaising
theCargoBed(page25).
4.Shutofftheengineandremovethekey.
5.Allowthemachinetocoolbeforeperforming
maintenance.
UsingtheBedSupport
Important:Alwaysinstallorremovethebed
supportfromtheoutsideofthebed.
1.Raisethebeduntiltheliftcylindersarefully
extended.
2.Removethebedsupportfromthestorage
bracketsonthebackoftheROPSpanel(Figure
28).
g026142
Figure28
1.Bedsupport
3.Pushthebedsupportontothecylinderrod,and
ensurethatthesupport-endtabsrestonthe
endofthecylinderbarrelandcylinder-rodend
(Figure29).
g009164
Figure29
1.Bedsupport3.Bed
2.Cylinderbarrel
4.Removethebedsupportfromthecylinder,and
insertitintothebracketsonthebackofthe
ROPSpanel.
Important:Donottrytolowerthebedwith
thebed-safetysupportonthecylinder.
35