EasyManua.ls Logo

Toshiba 3000 - Pre-Operation Checks; System Start and Stop Procedures

Toshiba 3000
150 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22 model 3000 ADMAP-5M AN712 Module User’s Manual
Chapter 4 Operation
4
4.1 Check Before Operation
Before switching power on and starting the product, check the switch settings, installation
and wiring again that they conform to the instructions given in the Process LAN ADMAP
Installation and Wiring Manual (6F8C0479).
(1) Checking the switch settings: Check the settings of the station address setting
switches and operation mode setting switches.
(2) Wiring check: Check the wiring, referring to the Process LAN ADMAP Installation
and Wiring Manual (6F8C0479).
4.2 Starting
The system starts operating automatically when power is switched on.
When the EN7 modules start, check that they are operating normally, referring to Table
2-1, Status LEDs.
If the modules fail to start, or if their operation is not normal, stop use and contact the
nearest Toshiba service office.
4.3 Stopping
Operation stops when power is switched off.

Table of Contents

Related product manuals