EasyManua.ls Logo

Trox Technik FKR-EU - Page 132

Trox Technik FKR-EU
164 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Dry mortarless installation with installation kit TQ in wooden beam / laminated beam ceiling, suspended
Fig. 103: Dry mortarless installation with installation kit TQ into wooden beam / laminated beam ceiling, suspended
(illustration representative, alternative ceiling construction possible on request)
1 FKR-EU
2.11 Installation kit TQ (factory assembled)
5.1 Dry wall screw
6.5 Mineral wool filling depending on ceiling con-
struction
7.11 Trim panel, same construction as 7.19
7.15 Wood sheet, min. 600 kg/m³
7.16 Wooden beam / gluelam min. 100 × 80 mm
(reduce distances between wooden beams to the
size of the installation opening)
7.17 Trimmers, wooden beam / glued laminated
timber min. 100 × 80 mm
7.19 Fire-resistant cladding (ceiling-dependent)
Z Spigot construction 370 mm
Flange construction 342 mm
Up to EI 90 S
Up to EI 60 S
EI 30 S
Additional requirements: dry mortarless installation
with installation kit TQ into wooden beam / lami-
nated beam ceilings
Wooden beam ceiling,
Ä
on page 36
Installation kit TQ,
Ä
on page 32
75 mm distance from the fire damper to load-
bearing structural elements (structure 100 mm)
200 mm distance between two fire dampers in
separate installation openings
Fasten the cover plate to the wooden beam / glue-
laminated beam ceiling with 4 (for nominal widths up
to 400 mm) or 12 (for nominal widths from 450 mm)
dry wall screws Æ 4.2 mm
Note:
Structural and fire resistance properties of the ceiling
construction, including the attachment to the con-
crete or any required reinforcement, have to be eval-
uated and ensured by others.
Installation
Wooden beam ceilings > Dry mortarless installation with installation ...
Fire damper FKR-EU132

Table of Contents

Other manuals for Trox Technik FKR-EU

Related product manuals