5.9.2 Mortar-based installation
Mortar-based installation into shaft wall with metal support structure
Fig. 75: Mortar-based installation into shaft wall with metal support structure
1 FKR-EU
2.1 Mortar
3.7 Shaft wall with metal support structure, cladding
on one side
3.10 Wall without adequate fire resistance rating
4.1 Solid ceiling slab / solid floor
5.1 Dry wall screw
6.5 Mineral wool (depending on wall construction)
7.1 UW section
7.5 Steel support structure (box section)
7.10 Trim panels
7.13.1 Cladding, single-layer, adjusted
7.14 Reinforcing board of the same material as the
wall
9.2 Extension piece or duct
Z Spigot construction 370 mm
Flange construction 342 mm
*
Installation near the floor analogous to
# optional
Up to EI 90 S
EI 30 S
EI 30 S – EI 90 S
Installation
Shaft walls with metal support structure > Mortar-based installation
Fire damper FKR-EU100