5.8.3 Dry mortarless installation with installation kit TQ
Fig. 71: Dry mortarless installation into a solid wood wall or CLT wall, with installation kit TQ
1 FKR-EU
2.11 Installation kit TQ (factory assembled)
3.11 Solid wood wall / CLT wall
4.1 Solid ceiling slab / solid floor
6.13 Mineral wool strips A1, 5 mm thick, 1000°C,
filler as an alternative
7.10 Trim panels (fire-resistant)
7.13a Cladding, single-layer, fire-resistant
Z Spigot construction 370 mm
Flange construction 342 mm
*
Installation near the floor analogous to
** Cover plate, shortened by others
# optional
Up to EI 90 S
Additional requirements: dry mortarless installation
with installation kit TQ in solid wood walls
Solid wood wall or CLT wall,
Ä
on page 35
Installation kit TQ,
Ä
on page 32
200 mm distance between two fire dampers in
separate installation openings
Fasten the cover plate to the solid wood or CLT wall
with 4 (for nominal widths up to 400 mm) or 12 (for
nominal widths from 450 mm) dry wall screws
Æ 4.2 mm
Installation
Solid wood walls > Dry mortarless installation with installation ...
Fire damper FKR-EU 95

Table of Contents

Other manuals for Trox Technik FKR-EU

Related product manuals