1 FKR-EU
2.4 Coated board system
3.4 Timber stud wall (also timber panel construc-
tions), cladding on both sides
4.1 Solid ceiling slab / solid floor
6.5 Mineral wool (depending on wall construction)
7.7 Timber stud / nogging, at least 60 × 60 mm
7.10 Trim panels (fire-resistant)
7.11 Trim panels, double layer with staggered joints,
fire-resistant
7.12 Trim panels, wood sheet, at least 600 kg/³
7.13 Cladding
7.13a Cladding, fire-resistant
7.13b Cladding, wood sheet, at least 600 kg/³
7.14 Reinforcing board of the same material as the
wall
7.17 Trimmers, timber stud / nogging,
at least 60 × 60 mm
Z Spigot construction 370 mm
Flange construction 342 mm
s2 Spigot construction 40 – 600 mm
Flange construction 80 – 600 mm
*
Installation near the floor analogous to
Up to EI 60 S
EI 30 S
EI 30 S to EI 60 S
Timber structure
Fig. 66: Dry mortarless installation with fire batt into a half-timbered construction
1 FKR-EU
2.4 Coated board system
3.5 Half-timbered construction, cladding on both
sides
4.1 Solid ceiling slab / solid floor
6.8 Infill (cavities completely filled with mineral wool
1000 °C, 50 kg/m³, or bricks, aerated con-
crete, lightweight concrete, reinforced concrete or
clay)
7.9 Timber structure
7.11 Trim panels, double layer with staggered joints,
fire-resistant
7.13 Cladding
7.14 Reinforcing board of the same material as the
wall
Z Spigot construction 370 mm
Flange construction 342 mm
*
Installation near the floor analogous to
Up to EI 60 S
EI 30 S
Installation
Lightweight partition walls with timber support ... > Dry mortarless installation with fire batt
Fire damper FKR-EU 89