10. OPERATING INSTRUCTIONS
It is recommended to perform a B&D test cycle at the beginning of each
working day.
10.1. Turning on the autoclave
To start the system, press the main white switch (1) on the right side
of the autoclave.
In this stage the unit is heated to the operating temperature, (approx.
15 min). During the heating stage the preheating symbol is
displayed. If beginning from cold autoclave, generator is not ready
symbol will be displayed
When the unit is ready the pre-heating symbol is replaced by the
next load number (see picture below).
10.2. Opening the door
Place your thumb on the plastic cover of the locking unit (1) and the
other fingers in the handle (3).
Pull the handle (2) until the locking of the door is released.
Open the door.
10.3. Loading
Load the autoclave properly according to instructions in chapter 9.
Compatible goods.
Do not overload.
1
1
3
2