EasyManua.ls Logo

Vatech Green 16 - Page 38

Vatech Green 16
162 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Before Installing the System
30 Green 16/18 Installation Manual
Transportation
1. Pull out the upper and lower carrying handles from EPS (Main Base).
2. Assemble the upper carrying handle by using one wrench bolt.
Wrench Bolt
M8 x 25
(2 Items)
- 1 pc
Allen Wrench 6 mm / 0.24”
The Wrench Bolt is attached to the upper carrying
handle. Remove the bolt from the handle first.

Table of Contents

Related product manuals