2. Choosing an Installation Site
Smart Plus (PHT-35LHS) Installation Manual 11
2. Choosing an Installation Site
2.1 Room Requirements
The location of this equipment should allow for the high
visibility of the patient by the operator, and the operator
should be as about the patient as possible.
This equipment should not be installed on thick carpets
for stability reasons.
Anti-static floor materials should be used around the
equipment.
The PC monitor, emergency cut-off switch, and X-ray
Exposure Switch should be installed near the operator
so that he or she can manage them simultaneously in
case of an emergency.
<Without CEPH Unit (optional): 2,044.3 mm (L) x 2,457.5 mm (W) or wider >