4. Installing the Equipment: Base Stand (Optional)
Smart Plus (PHT-35LHS) Installation Manual 61
4.7 Leveling the Equipment
T-shaped Hex Wench 8 mm / 0.3”
Spirit Level N/A
Ensure that the Spirit Level should rest only on the
locations indicated in the following figures to obtain the
accurate center.
1. Prepare the Spirit Level.
2. Turn the Rotating Unit clockwise so that the X-ray tube head faces the front as
shown in the figure.
3. Turn all eight screws on the base plate unit clockwise until they touch the
ground.