7
Ensure that the long blue tabs on the SAS3 connectors point toward the center
of the 2U12 shelf.
8
If you plan to connect a second 2U12 shelf, obtain two SAS3 cables.
In the first 2U12 shelf, connect port B in the top canister to port A in the top
canister of the new 2U12 shelf.
In the first 2U12 shelf, connect port B in the bottom canister to port A in the
bottom canister of the new 2U12 shelf.
118Adding 2U12 storage shelves to an operational NetBackup 5230 Appliance
Connecting the 2U12 shelves to an appliance or other storage shelves

Table of Contents

Other manuals for VERITAS NetBackup 5230

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the VERITAS NetBackup 5230 and is the answer not in the manual?

VERITAS NetBackup 5230 Specifications

General IconGeneral
Language version-
License typeCorporate
License quantity- license(s)
License term in years1 year(s)

Related product manuals