EasyManuals Logo

VERITAS NetBackup 5230 Hardware Installation Guide

VERITAS NetBackup 5230
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #72 background imageLoading...
Page #72 background image
To connect additional 3U16 storage shelves
1
Locate the two SAS2 cables that are shipped with the 3U16 storage shelf.
2
Locate the SAS_IN and SAS_OUT ports on both I/O modules on the rear of
the storage shelf.
3
Locate the left I/O module of the 3U16 storage shelf that is connected to the
appliance.
4
Plug one end of a SAS2 cable into the SAS_OUT port in that I/O module.
5
Connect the other end of the SAS2 cable to the SAS_IN port in the left I/O
module in the additional storage shelf.
6
Plug one end of another SAS2 cable into the SAS_OUT port in the right I/O
module of the storage shelf that is connected to the appliance.
7
Connect the other end of the SAS2 cable to the SAS_IN port in the right I/O
module in the additional storage shelf.
Connecting the 3U16 storage shelf and appliance
power cords
Each appliance and each storage shelf contain two AC power supplies. To ensure
power redundancy, connect the power supplies on each component to separate
AC power sources.
72Adding 3U16 storage shelves to an operational NetBackup 5230 Appliance
Connecting the 3U16 storage shelf and appliance power cords

Table of Contents

Other manuals for VERITAS NetBackup 5230

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the VERITAS NetBackup 5230 and is the answer not in the manual?

VERITAS NetBackup 5230 Specifications

General IconGeneral
Language version-
License typeCorporate
License quantity- license(s)
License term in years1 year(s)

Related product manuals