connectivity Liebert Trinergy™ Cube
Installation Manual - 10H52243IM60 - rev. 7 - 06/2020 Page 109
5. CONNECTIVITY
5.1. UPS signal wiring: interconnecting the communication cables
The internal connectivity panels are placed in the CORE and in the I/O BOX as shown the figures below.
To access the connectivity panel, remove the CORE and I/O BOX connectivity cover panels.
Replace the CORE and I/O BOX connectivity cover panels when the procedure is complete.
The signal wiring passes in the upper part inside the machine.
Figure 110 - CORE - Connectivity panel