MECHANICAL INSTALLATION Liebert Trinergy™ Cube
Installation Manual - 10H52243IM60 - rev. 7 - 06/2020 Page 55
2.11.3. I/O BOX 3000A IN ROW assembly procedure
The 3000A BOX has two cabinets: one for the static and one for the I/O customer connections.
These two boxes must be mounted and connected together as the first step of installation.
The CORE assembly procedure (para. 2.11 on page 47) can only be performed once this assembly is
completed.
Use contact grease for the correct connection and installation of the bus-bars.
For the torque wrench settings, refer to chap. 7. on page 127.
Figure 57 - STEP 1 - Connections to be performed on the mountings
(see “NOTE” on page 133)