Liebert Trinergy™ Cube MECHANICAL INSTALLATION
Page 48 Installation Manual - 10H52243IM60 - rev. 7 - 06/2020
2.11.1. I/O BOX 600-1200A with the CORES assembly procedure (RIGHT SIDE CORES)
1) Remove the CORE from the pallet by removing the special mounting screws (see Fig. 44 - on page
48).
Figure 44 - UNPACKING - CORE
2) Remove the I/O BOX from the pallet by removing the special mounting screws (see Fig. 45 - on page
48).
Figure 45 - UNPACKING - I/O BOX 1200A
3) Remove the right panel in the I/O BOX.