Liebert Trinergy™ Cube MECHANICAL INSTALLATION
Page 48 Installation Manual - 10H52243IM60 - rev. 7 - 06/2020
2.11.1. I/O BOX 600-1200A with the CORES assembly procedure (RIGHT SIDE CORES)
1) Remove the CORE from the pallet by removing the special mounting screws (see Fig. 44 - on page
48).
Figure 44 - UNPACKING - CORE
2) Remove the I/O BOX from the pallet by removing the special mounting screws (see Fig. 45 - on page
48).
Figure 45 - UNPACKING - I/O BOX 1200A
3) Remove the right panel in the I/O BOX.
wrench 10mm
wrench 10mm

Table of Contents

Other manuals for Vertiv Liebert Trinergy Cube

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vertiv Liebert Trinergy Cube and is the answer not in the manual?

Vertiv Liebert Trinergy Cube Specifications

General IconGeneral
BrandVertiv
ModelLiebert Trinergy Cube
CategoryUPS
LanguageEnglish

Related product manuals