MECHANICAL INSTALLATION Liebert Trinergy™ Cube
Installation Manual - 10H52243IM60 - rev. 7 - 06/2020 Page 65
2.11.5. I/O BOX 4000-5000A IN ROW assembly procedure
The 4000-5000A BOX has two cabinets: one for the static and one for the I/O customer connections.
These two cubicles must be mounted and connected together as first step of installation. The CORE
assembly procedure (para. 2.11 on page 47) can only be performed once this assembly is completed.
For the torque wrench settings, refer to chap. 7. on page 127.
Mechanical connection of the two cubicles:
N. 7 SCREWS M10x25 with FLAT WASHER and GROWER
Figure 69 - STEP 1 - Connections performed on mountings (“NOTE” on page 133) - FRONT VIEW