Electrical INSTALLATION Liebert Trinergy™ Cube
Installation Manual - 10H52243IM60 - rev. 7 - 06/2020 Page 79
4.4. IT power distribution systems
IT power distribution systems are isolated from earth, except that one point may be connected to earth
through an impedance or a voltage limiter. The parts of the equipment that need to be earthed are
connected to earth electrodes at the user’s premises (see Fig. 88 - on page 79).
Figure 88 - IT Power Distribution System

Table of Contents

Other manuals for Vertiv Liebert Trinergy Cube

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vertiv Liebert Trinergy Cube and is the answer not in the manual?

Vertiv Liebert Trinergy Cube Specifications

General IconGeneral
BrandVertiv
ModelLiebert Trinergy Cube
CategoryUPS
LanguageEnglish

Related product manuals