EasyManua.ls Logo

Wacker Neuson 803 - Page 181

Wacker Neuson 803
228 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OM 803 us – Edition 3.7 * * 803b540.fm 5-41
Maintenance
Stabilizer blade
●●
Swiveling console
●●
Swiveling cylinder
●●
Boom
●●
•Stick
●●
Attachments
●●
Teeth of live ring
●●
Live ring (ball bearing)
●●
Ball sockets (ISO/SAE changeover option)
Functional check ( ):
Check the function of the following assemblies/components. Rectify if necessary:
Lights and acoustic warning system
●●
Check pedal function
●●
Leakage check ( ):
Check for tightness, leaks and chafing: pipes, flexible lines and threaded fittings of the following assemblies and components. Rectify if necessary:
Visual check
●●
Engine, hydraulic system and hydraulic components
●●
Cooling circuit
●●
Traveling drive
●●
5.16 Maintenance plan (overview)
Work description
For servicing and maintenance on the attachment, please refer to the operation and maintenance manual of
the attachment manufacturer.
Maintenance plan/operating hours (o/h)
Maintenance
(once a day)
Every 50 o/h
Every 250 o/h
Every 500 o/h
Every 1000 o/h
once a year
Every 2000 o/h
Customer
Wacker Neuson
service center

Table of Contents

Other manuals for Wacker Neuson 803

Related product manuals