EasyManua.ls Logo

Wacker Neuson E05-05

Wacker Neuson E05-05
292 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BA 50Z3/6003 en – Edition 4.3 * 5003b340.fm 3-95
Operation
Boom swivel controls (from serial number AJ02777)
Swivelling the boom to the left:
Unfold the hammer pedal cover
Press and hold button A on the control lever
Move hammer pedal 2 forward at the same time
Swivelling the boom to the right:
Unfold the hammer pedal cover
Press and hold button A on the control lever
Move hammer pedal 2 backward at the same time
Right-hand control lever
Fig. 193: Swivel controls
A
2
Fig. 194: Right-hand control lever
H
G
E
F
Position Lever Function
E
Forward Lowers the boom
F
To the right Tilts out the bucket
G
Backward Raises the boom
H
To the left Tilts in the bucket
Fig. 195: Functions of right-hand control lever
H
JI
Button Function
H
Horn
I
Operates the 3rd control circuit
J
Operates the 3rd control circuit

Table of Contents

Related product manuals