Further practical hints for digging
When planning and performing digging work, we recommend that you observe the follow-
ing points:
Exits from pits must be outside the digging line and as level as possible.
Dig by removing adjacent strips if possible.
Ensure that you can drive forward when driving out of the digging area with a fully
loaded bucket.
Whenever possible, drive in reverse when transporting a full bucket down a steep
slope.
Loading vehicles
When loading vehicles, we recommend taking the following into account:
If possible, the vehicle and the working direction of the bucket should form an angle of
45°.
Raise the full bucket to dump height only as you rotate toward the vehicle to be loaded.
If possible dump with the wind behind you to keep the dust away from your eyes, air
filters and fans.
Freeing the machine
Dump out the bucket until the blade is vertical above the ground.
Lower the boom all the way.
Slowly dump out the bucket.
The machine is pushed backward.
Reverse slowly.
Repeat this procedure until the tracks reach firm ground
Reverse the machine away.
3.67 Grading
Danger!
Careful when grading –
Risk of accidents.
Ensure that no-one is in the risk zone when working with the stabilizer
blade.
Grading
Lower the stabilizer blade to the ground
see chapter 3.17 Stabilizer blade operation on page 3-28.
Set the depth of the layer you want to remove with the stabilizer-blade lever.
The machine must not be raised by lowering the stabilizer blade.
The clearance between the stabilizer blade and the ground should be about 1 cm
(0.39").