EasyManua.ls Logo

Waters ACQUITY UPLC - Installing One CM-Aux Module, in a Single-Stack Configuration

Waters ACQUITY UPLC
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
48
Notes:
The two-column configuration for the ACQUITY UPLC I-Class system
uses low-volume tubing with high-pressure fittings.
When installing the active preheater on the column inlet, use a wrench
to tighten the gold fitting onto the column an additional 1/4-turn.
The dual-threaded finger-tight fitting secures the tubing to the column
outlet in ACQUITY UPLC I-Class systems.
Installing one CM-Aux module, in a single-stack configuration
The single-stack configuration supports up to four columns (in any
combination of 50-, 100- or 150-mm columns). The inlet valve is located on the
right-hand side of the column manager.
Required materials
Gloves: clean, powder-free, chemical-resistant
4-column tubing set, for installing the upper auxiliary column manager
(CM-Aux)
Required tools
1/4-inch open-end wrench
1/2-inch open-end wrench
•2-mm Hex wrench
5/16-inch open-end wrench
7/16-inch open-end wrench
T10 TORX driver
T20 TORX driver
Right-angle nut extender tool, for low-pressure fittings
Stainless steel tubing cutter, for cutting waste tubing to length
Repositioning instruments in the system stack
To reposition the instruments in the system stack:
1. Power-off the column manager (CM-A) and detector.

Other manuals for Waters ACQUITY UPLC

Related product manuals