EasyManua.ls Logo

Welch Allyn 6000 Series - Remove the Main Board

Welch Allyn 6000 Series
130 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Reinstall the LCD display in the reverse order of disassembly.
5. Reinstall the main board in the reverse order of disassembly.
6. Install the probe well seal onto the the probe well as described in the reassembly notes for the
temperature module.
7. Insert the temperature module into the front housing aligning the probe well with the access
hole in the front housing.
8. Secure the top of the temperature module housing to the front housing with two screws
included with the kit.
9. Place the HSG clamp on the bottom of the temperature housing and secure with two screws.
10. Reassemble the monitor in the reverse order of disassembly.
Remove the main board
Note If you are replacing this board, you must have the service tool, Gold edition, to re-
enter the serial number of the monitor and the main board.
No. Item No. Item
42 Front housing 51 Foam pad, bottom
74
Disassembly and repair Welch Allyn Vital Signs Monitor 6000 Series™

Table of Contents

Related product manuals