4
1. Important initial information for the Technician
1. Important initial information for the Technician
1.1 Safety precautions
The boiler and related accessories are state of the art and meet all applicable safety regulations. Your boiler and
all accessories operate using 230 V AC electric current. Improper installation or repair can pose the danger of
life-threatening electric shock. Installation may be performed only by appropriately qualified technicians.
Caution symbols
Please take careful note of the following symbols in these Installation instructions.
Attention!
Ignoring the warnings identified can lead to personal injury.
Information!
Ignoring the warnings identified can lead to malfunction of, or damage to the boiler or heating
system.
Note!
The blocks of text highlighted provide information and tips for operation.
1.2 Application options
FireWIN is designed for installation in the living area and is configured as a fully featured central heating system.
This means no second heat generator is required. If desired, however, FireWIN can be combined with alternative
heat generators (e.g. solar or solid fuel boiler). Refer to the hydraulic systems for details about this.
The necessary hydraulic components for a heating circuit as well as hot water preparation are integrated in
FireWIN (see hydraulic equipment). This means there is no longer any need for a boiler room or equipment room
and that FireWIN is ideally suited for use as a central heating system in houses without a basement or when
central heating is being installed in a building for the first time as part of a renovation project.
Attention!
The configuration of the entire system must comply with the requirements of regional legislation,
applicable regulations, standards and guidelines.