EasyManua.ls Logo

ABB IRB 920 - Page 908

ABB IRB 920
1008 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removing the axis-2 gear unit sub-assembly
Use these procedures to remove the axis-2 gear unit sub-assembly.
Preparations before removing the axis-2 gear unit sub-assembly
NoteAction
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
1
If there is no enough space for the maintenance
work, remove the robot from the wall and place it
on the maintenance bracket.
CAUTION
Do not lay down the robot during the transporta-
tion, always keep it straight.
If the robot lay down in any situation, the grease
may come out from gearbox.
2
xx2100000930
Jog all axes to zero position.3
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the safeguarded
space.
4
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See Cut the paint or surface on the robot before
replacing parts on page 118.
5
Continues on next page
908 Product manual - IRB 920
3HAC075721-001 Revision: C
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.8.2 Replacing the axis-2 gear unit sub-assembly
Continued

Table of Contents

Related product manuals