Preparation for installation 17
Preparation for installation
Contents of this chapter
This chapter describes the required preparations that should be done before you install a
NETA-21 unit.
List of required materials
Make sure that you have the necessary equipment and materials for the commissioning.
The required materials are listed in this chapter. For any installation, make sure that you
have the usual tools for installation, such as, suitable power supplies, MCB connectors,
screw drivers, a wire cutter, a wire stripper, a crimping tool, cable lugs, and so on.