Section 12 Testing IED operation
12.1 Preparing for test
IP336-1 v1
12.1.1 Requirements
M11740-2 v9
IED test requirements:
Calculated settings
Application configuration diagram
Signal matrix (SMT) configuration
Terminal connection diagram
Technical manual
Three-phase test equipment
Process bus, IEC/UCA 61850-9-2LE, MU test simulator, if IEC/UCA
61850-9-2LE process bus communication is used.
PCM600
The setting and configuration of the IED must be completed before the testing can
start.
The terminal diagram, available in the technical reference manual, is a general diagram
of the IED.
Note that the same diagram is not always applicable to each specific
delivery (especially for the configuration of all the binary inputs and
outputs).
Therefore, before testing, check that the available terminal diagram corresponds to the
IED.
The technical manual contains application and functionality summaries, function
blocks, logic diagrams, input and output signals, setting parameters and technical data
sorted per function.
The test equipment should be able to provide a three-phase supply of voltages and
currents. The magnitude of voltage and current as well as the phase angle between
voltage and current must be variable. The voltages and currents from the test
equipment must be obtained from the same source and they must have minimal
1MRK 502 073-UUS A Section 12
Testing IED operation
Generator protection REG670 2.2 ANSI and Injection equipment REX060, REX061, REX062 123
Commissioning manual

Table of Contents

Other manuals for ABB REG670

Related product manuals