Section 1 Introduction
1.1 This manual
GUID-AB423A30-13C2-46AF-B7FE-A73BB425EB5F v18
The commissioning manual contains instructions on how to commission the IED. The
manual can also be used by system engineers and maintenance personnel for assistance
during the testing phase. The manual provides procedures for the checking of external
circuitry and energizing the IED, parameter setting and configuration as well as
verifying settings by secondary injection. The manual describes the process of testing
an IED in a substation which is not in service. The chapters are organized in the
chronological order in which the IED should be commissioned. The relevant
procedures may be followed also during the service and maintenance activities.
1.2 Intended audience
GUID-C9B8127F-5748-4BEA-9E4F-CC762FE28A3A v11
This manual addresses the personnel responsible for commissioning, maintenance and
taking the IED in and out of normal service.
The commissioning personnel must have a basic knowledge of handling electronic
equipment. The commissioning and maintenance personnel must be well experienced
in using protection equipment, test equipment, protection functions and the configured
functional logics in the IED.
1MRK 502 073-UUS A Section 1
Introduction
Generator protection REG670 2.2 ANSI and Injection equipment REX060, REX061, REX062 13
Commissioning manual

Table of Contents

Other manuals for ABB REG670

Related product manuals