EasyManua.ls Logo

ABB REG670 - Page 84

ABB REG670
324 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ICT continuously logs data to this file with logging interval set under graph
update period. Notice that there is a field named Log period and its default value
is 1 hour. The period can be adjusted before the logging is started, if needed.
5. The logging can be stopped by selecting the Stop button.
6. You can open the file in notepad or MS Excel.
Section 6 1MRK 502 073-UUS A
Calibrating injection based sensitive rotor earth fault protection
78 Generator protection REG670 2.2 ANSI and Injection equipment REX060, REX061, REX062
Commissioning manual

Table of Contents

Other manuals for ABB REG670

Related product manuals