Verifying SPA communication........................................................... 98
Verifying IEC communication............................................................ 98
Fibre optic loop....................................................................................... 99
Optical budget calculation for serial communication with SPA/IEC ....... 99
Section 9 Establishing connection and verifying the LON
communication.................................................................. 101
Communication via the rear ports ........................................................101
LON communication........................................................................ 101
The LON Protocol............................................................................102
Hardware and software modules.....................................................102
Optical budget calculation for serial communication with LON ............104
Section 10 Establishing connection and verifying the IEC 61850
communication.................................................................. 107
Overview...............................................................................................107
Setting the station communication........................................................107
Verifying the communication.................................................................108
Section 11 Establishing connection and verifying the IEEE
C37.118/1344 communication...........................................109
Overview...............................................................................................109
Setting the PMU station communication (PMU Report)........................109
Setting the PMU station communication (PMU configuration)..............110
Setting the TCP/UDP client communication......................................... 111
Verifying the communication.................................................................114
Verifying the IEEE C37.118/1344 TCP communication.................. 115
Verifying the IEEE C37.118/1344 UDP communication.................. 121
Optical budget calculation for PMU - PDC communication.................. 122
Section 12 Testing IED operation........................................................123
Preparing for test.................................................................................. 123
Requirements.................................................................................. 123
Preparing the IED to verify settings................................................. 125
Activating the test mode....................................................................... 126
Preparing the connection to the test equipment................................... 126
Connecting the test equipment to the IED............................................ 127
Releasing the function to be tested...................................................... 128
Verifying analog primary and secondary measurement....................... 129
Testing the protection functionality....................................................... 130
Forcing of binary input/output signals for testing.................................. 130
Forcing concept............................................................................... 130
Table of contents
Generator protection REG670 2.2 ANSI and Injection equipment REX060, REX061, REX062 3
Commissioning manual