ABB Relion REC670 - Configuration Setting; Interlocking for 1 1;2 CB BH

ABB Relion REC670
482 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WA1 (A)
WA2 (B)
QB1
QC1
QA1
QC2
QC9
QB61
QB9
QB2
QC4
QA2
QC5
QC3
QB62
DB_BUS_B
DB_LINE
DB_BUS_A
en04000518.vsd
IEC04000518 V1 EN-US
Figure 148: Switchyard layout double circuit breaker
M13584-4 v4
For a double circuit-breaker bay, the modules DB_BUS_A, DB_LINE and DB_BUS_B must be
used.
13.4.8.2 Configuration setting
M13584-6 v5
For application without QB9 and QC9, just set the appropriate inputs to open state and
disregard the outputs. In the functional block diagram, 0 and 1 are designated 0=FALSE and
1=TRUE:
QB9_OP = 1
QB9_CL = 0
QC9_OP = 1
QC9_CL = 0
If, in this case, line voltage supervision is added, then rather than setting QB9 to open state,
specify the state of the voltage supervision:
QB9_OP = VOLT_OFF
QB9_CL = VOLT_ON
If there is no voltage supervision, then set the corresponding inputs as follows:
VOLT_OFF = 1
VOLT_ON = 0
13.4.9 Interlocking for 1 1/2 CB BH
IP14173-1 v3
1MRK 511 358-UEN A Section 13
Control
295
Application manual