EasyManua.ls Logo

ADS TRITON+ - Page 191

ADS TRITON+
535 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Configuration and Activation 4-89
5. Continue with other activities that require communication with
the monitor or disconnect from the monitor by clicking on the
green Hangup button in the Functions section. If applicable
to the connection type, consider checking the monitor status to
verify the monitor is active and the data storage interval
reflects the sample rate selected for the monitor.
Important Note: When installing a TRITON+ monitor
with an AV|Gated, AV|Max, ParaDepth or ParaFlow
sensor, the next step after the monitor activation and
sensor installation is to verify the sensor is installed
properly with a Sensor Rotation and Sensor Slope of no
more than +/- 5 degrees. The closer the Rotation and Slope
are to zero, the better. Proceed to Running Sensor
Diagnostics on page 4-92 for more details.
Qstart
XML
generates a log entry of the activation event which is
available for viewing through the log viewer in Qstart
XML
.

Table of Contents

Related product manuals