Maintenance and Troubleshooting 11-33
Returning the monitor top to the proper orientation with the canister – Align
COMM+EXT PWR Connector with the backside of canister and molded
mounting flange.
17. Finger-tighten the top bolts to make sure the top and gasket are
seated properly. Then, tighten the bolts about halfway to full
torque value by tightening the opposite bolts. Finally, tighten
the bolts to approximately 30 inch-pounds (2.50 foot-pounds/
3.39 Nm) to fully secure the top to the canister. If the monitor
will not seal, loosen the bolts and check for a trapped wire or
debris on either the gasket or the lip. You can increase the
torque value on the bolts incrementally to assist in sealing.
However, tighten the bolts evenly to prevent distorting the
gasket and do not exceed 45-inch pounds (5.0843Nm).
18. Change the APN name using Advanced > Modem Setup
device in Qstart
XML
(as necessary).
19. Request a SIM deactivation for the removed SIM by emailing
ADSEODIP@idexcorp.com (or the network service provider).
Include the IP address, the last four (4) digits of the SIM