Installing the GC 1
Agilent Intuvo 9000 GC Installation 9
• Customization of the system.
• Method development and testing.
• Analysis of customer standards or samples.
• Testing against the instrument performance specification.
(Operational qualification and performance verification
services, OQ/PV, can be purchased separately.)
If you need assistance beyond this installation service, please
contact your local Agilent Technologies office. Assistance with
installation and with user-specific services and applications is
available and will be contracted separately.
Tools and additional parts required
Installation requires the following tools, fittings, and hardware.
These items are not included with the instrument.
• Precleaned copper tubing, 1/8-inch or 1/4-inch od.
• Fittings.
• Tubing cutter.
• Filters for gas supplies.
• 7/16-inch and 9/16-inch open-end wrenches for assembling
Swagelok fittings.
• Carrier and other gas supplies.
• Pressure regulator for each gas supply.
• A computer, tablet, or other LAN-capable device (for
accessing GC user information and for firmware updates).
• Any additional LAN components, such as cables and a switch
or hub, for connection to the site LAN (not included in
Agilent installation services).
The Agilent Intuvo 9000 GC, GC/MS, and ALS Site Preparation
Guide contains a listing of Agilent installation kits and a
description of parts included with each. These kits contain
filters, fittings, tubing, tools (wrenches, tubing cutter, drivers,
and so on), and other required parts for installing a GC.)
Performing checkout
If using an Agilent data system, you can use it to perform the
checkout procedure. Read these GC installation instructions
and the instructions for installing the data system.