126 Agilent U1251B/U1252B User’s and Service Guide
6 Performance Tests and Calibration
Performance Verification Tests
Use the Performance Verification Tests to verify the
measurement performance of the instrument. The
performance verification tests use the instrument’s
specifications listed in the U1251B/U1252B Data Sheet.
The performance verification tests are recommended as
acceptance tests when you first receive the instrument. The
acceptance test results should be compared against the one
year test limits. After acceptance, you should repeat the
performance verification tests at every calibration interval.
Make sure you have read the “Test Considerations” on page 124 before
doing the performance verification tests.