EasyManua.ls Logo

Allen-Bradley PLC-5 - Page 333

Allen-Bradley PLC-5
388 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Publication 1785-UM012D-EN-P - July 2005
Instruction Set Quick Reference D-33
Category Code Title Time (µs)
Integer
Time (µs)
Floating Point
Words of
Memory
(1)
True False True False
Sequencer SQI sequencer input 7.9 1.3 5-9
SQL sequencer load 7.9 3.5 4-7
SQO sequencer output 9.7 3.7 5-9
Immediate I/O
(2)
IIN immediate input
PLC-5/11, -5/20,
and -5/20E
PLC5/30, -5/40,
-5/40E, -5/40L
-5/60, -5/60L, and
-5/80, -5/80E
•357
•307
1.1 2
IOT immediate output
PLC-5/11, -5/20,
and -5/20E
PLC5/30, -5/40,
-5/40E, -5/40L
-5/60, -5/60L,
-5/80, and -5/80E
•361
•301
1.1 2
Zone Control MCR master control 0.16 0.16 1
Program Control JMP jump 8.9+(file# - 2)
* 0.96
1.4 2
JSR
(3)
/RET
jump to subroutine
/return
— 0 parameters
— 1 parameter
— increase/
parameter
12.3
16.1
3.8
1.0
1.0
not applicable
not applicable
17.3
5.0
not applicable
1.0
not applicable
3+paramete
rs/JSR
1+paramete
rs/RET
SBR 1+
parameters
(1)
Use the larger number for addresses beyond 2048 words in the controllers data table.
(2)
Timing for immediate I/O instructions is the time for the instruction to queue-up for processing.
(3)
Calculate execution times as follows: (time) + (quantity of additional parameters)(time/parameter). For example: if you are passing 3 integer parameters in a JSR
within a PLC-5/11 controller, the execution time = 16.1 + (2)(3.8) = 23.7 ms

Table of Contents

Other manuals for Allen-Bradley PLC-5

Related product manuals