EasyManua.ls Logo

Ammann AV 70 X - After 2,000 Hours of Operation (after 2 Years); Checking and Adjusting Valve Clearance; Engine Coolant Exchange

Ammann AV 70 X
162 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
126 AV 70 X
400159
400158A
1
3.6. Lubrication and Maintenance Operations
After 2,000 hours of operation (after 2 years)
3.6.25. Checking and adjusting valve clearance
Call CUMMINS service department to adjust the engine •
valves. Next valve adjustment will follow periodically after
2000 hours or after two years - for contact points, please re-
fer to Engine Operation and Maintenance Manual.
3.6.26. Engine coolant exchange
How to drain cooling circuit:
Before you drain the coolant from the
cooling circuit let the engine run for 5
minutes for the liquid temperature to
reach 82°C (180°F).
Do not open overpressure plug before
coolant temperature drops below 50 °C
(122 °F). If you open overpressure plug
the liquid may splash out causing scald.
Stop the engine.
Open the cooling system by removing the overpressure •
plug (1) on the expansion tank.

Table of Contents

Related product manuals