EasyManuals Logo

Applied Biosystems StepOnePlus User Manual

Applied Biosystems StepOnePlus
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #125 background imageLoading...
Page #125 background image
DRAFT
September 25, 2007 1:07 am, 4376782_Maintain_the_System.fm
Chapter 6 Maintain the System
Regular Maintenance
103
Applied Biosystems StepOne
and StepOnePlus
Real-Time PCR Systems
Installation, Networking, and Maintenance Guide
Notes
Prepare for the
Calibration
IMPORTANT! Wear powder-free gloves when you handle the calibration plates.
1. If you have not already done so, use the StepOne system cable to connect the:
Yellow Ethernet port ( ) of the instrument to the
Ethernet port ( ) of the computer running the StepOne
software
IMPORTANT! Do not connect the StepOne system cable to the blue LAN Port ( ).
2. Get calibration plate 1 from the spectral calibration kit in the freezer.
3. Allow calibration plate 1 to warm to room temperature (~5 min).
IMPORTANT! Do not remove calibration plate 1 from its packaging until you are
ready to run it. The fluorescent dye in the wells of each calibration plate is
photosensitive. Prolonged exposure to light can diminish the fluorescence signal
strength of the dyes.
4. Remove calibration plate 1 from its packaging.
5. Vortex calibration plate 1 for 5 sec.
6. Centrifuge calibration plate 1 for 2 min at less than1500 rpm.
IMPORTANT! The calibration plate must be well mixed and centrifuged.
Ethernet

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Applied Biosystems StepOnePlus and is the answer not in the manual?

Applied Biosystems StepOnePlus Specifications

General IconGeneral
BrandApplied Biosystems
ModelStepOnePlus
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals