EasyManua.ls Logo

Astoria 2GR - 7. MAINTENANCE AND CLEANING; 7.1 Safety precautions; 7.2 Periodic maintenance; 7.4 Malfunctions and solutions

Astoria 2GR
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
USER manual56 of 216
Periodic Maintenance Table
Component Type of operation
Weekly
Monthly
Quarterly
PRESSURE GAUGE
Keep checking the heating unit pressure which must be between 0.08 and 0.14 MPa
(0.8 and 1.4 bar).
X
PRESSURE GAUGE
Periodically check the water pressure when coffee is being dispensed: check the pres-
sure indicated on the gauge, which must be in the range of 0.8 - 0.9 MPa (8 and 9 bar).
X
FILTERS AND
FILTER HOLDERS
Check the condition of the lters. Check for any damage on the edge of the lters and
check whether any coffee grounds settle in the coffee cup, and replace the lters and/
or lter holders, as required.
X
GRINDER-DISPENSER
Check the ground coffee dose (between 6 and 7 grams per time) and check the degree
of grinding. Grinders must always have sharp cutting edges. Too much powder in the
grounds is an indication that the coffee is deteriorating. We recommend contacting
the Technician to replace the at burrs after every 400/500 kg of coffee, or after every
800/900 kg for conical burrs.
X
WATER FILTER
WATER SOFTENER
Replace the water lter cartridge or regenerate the water softener as often as specied
by the manufacturer.
X
GAS SYSTEM Check for any gas leaks in the system by passing a soapy solution through the pipes. X
HEATING UNIT
We recommend calling out the Technician at least once every three months to replace
the water in the heating unit.
X
7. MAINTENANCE AND CLEANING
7.1 Safety precautions
Carefully read the instructions provided in chapter
"I. SAFETY PRECAUTIONS" on page 33.
7.2 Periodic maintenance
Besides carrying out maintenance activities according to
thefrequencyspeciedinthe“Periodicmaintenancetable”,
a general inspection must be carried out on the machine at
least once a year by a Technician.
Component problems highlighted in grey require
the machine to be switched off and one of the
Technicians to be called out.
7.3 Maintenance after a short period of
machine inactivity
“Short period of machine inactivity” refers to a period of time
exceeding one working week.
If the machine is switched back on after this period, the Tech-
nician must replace all the water inside the hydraulic circuits
as indicated in para. "7.2 Periodic maintenance" on page
56.
Furthermore, all periodic maintenance operations must be
carried out, see the previous paragraph.
Component problems highlighted in grey require
the machine to be switched off and one of the
Technicians to be called out.
7.4 Malfunctions and solutions
In the “Malfunctions and Solutions Table”, alarms and actions
to carry out in order to try and resolve the reported problem
are provided.
Problems highlighted in grey require the machine to
be switched off and the Technician to be called out.
If a malfunction cannot be resolved, turn the ma-
chine off and call out the Technician.

Table of Contents

Other manuals for Astoria 2GR

Related product manuals