13. Preventative maintenance actions
13.2 3 month maintenance actions
MAINTENANCE TYPE B (perform every three months)
The 3 mo nth maintenance actions, listed below, m ay be performed by a trained projectionist who is familiar
with potential hazards associated with the product.
No. Maintenance a ction Remarks
1
Clean the back/side air inlet vents of the Lam p Power Supply (LPS) .
Use a vacuum c leaner.
2
Clean the housing of your projector.
Removal overall dust accumulation
on projector covers. Se e cleaning
instructions in this man ual.
R5977692 DP2K-S SERIES 10/12/2012 103