9.8 Maintenance activities for filling equipment
9.8.1 Check filling hoses
The testing period for hose lines must be determined by operators as per the stipu-
lations of the locally applicable regulations (the Industrial Safety Regulation applies
in Germany). The hose lines must be tested by a competent person.
Based on the German regulations, Bauer recommends the following testing periods
for compressors:
Normal operating conditions:
Testing period: 6 months (including storage period)
Replacement schedules: 6 years
Storage period: max. 2 years
Increased requirements (strong internal and external influences, short cycle
times, pressure impulse):
Testing period: 6 months (including storage period)
Replacement schedules: 2 years
Storage period: max. 2 years
The compressor unit is switched off.
The compressor unit is depressurised
1.
Check whether connection threads are dimensionally correct and free of er-
rors.
2.
Check whether the transition point between the hose fitting and hose is dam-
aged.
3.
Check whether the outer hose covering is torn.
4.
Damaged hose lines must be exchanged and scrapped immediately.
OPERATING MANUAL Maintenance | 9
28.08.2019
A_002_en
107/150