EasyManua.ls Logo

Beckman Coulter Multisizer 4 - Page 41

Beckman Coulter Multisizer 4
238 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PN A51387AB
1-19
Analyzer Overview
Preparing the Analyzer for Sample Runs
1
NOTE
For aperture tubes up to 100 µm, you can use an Accuvette® ST (20 mL). Use an ST Beaker for any
aperture tube size larger than 100 µm.
4. Add a few drops of the calibrator, control sample, or sample to the electrolyte solution.
• For more information on calibration, see Calibrating the Aperture, page 3-10.
• For more information on control sample runs, see Running a Concentration Control Sample,
page 3-33.
• For more information on running a sample analysis, see Analyzing a Sample, page 6-1.
5. If necessary, use the platform release and lower the platform to the loading position.
6. If necessary, turn the platform so that the correct side (ST Beaker or Accuvette® ST) is on top
(see Sample Platform, page 1-9).
NOTE
The sample platform has two usable sides. The ST Beaker side has a built-in guide to ensure that
a Multisizer 4 Smart Technology Beaker of any size is in the correct position when you raise the
platform. The Accuvette® ST side has a smaller guide for Accuvette STs. The guides ensure that
the ST Beaker or Accuvette® ST will be in the correct position relative to the aperture tube,
electrode, and stirrer when you raise the platform.
7. Place the ST Beaker or Accuvette® ST on the sample platform.
8. Raise the platform.
NOTE
It is not necessary to use the platform release to lift the platform into position.

Table of Contents