EasyManua.ls Logo

Beckman Coulter Multisizer 4 - Page 89

Beckman Coulter Multisizer 4
238 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PN A51387AB
3-35
Installing and Calibrating an Aperture Tube
Running a Concentration Control Sample
3
4. In the Concentration Control window, enter the Lot Number, the Concentration Assay Value,
and the Expiration Date listed on the assay sheet.
5. Click
(
Start
)
to begin the concentration control run.
6. The Multisizer 4 software flushes the system and begins the run.
7. When the run is complete, a second Concentration Control window opens and displays results.
The window displays a message that the concentration is low or high if the Analyzer
measurement deviates from the concentration control by 10% or more. If this occurs, contact
Beckman Coulter Service. For information on how to do this, see Working with Field Service on
page 9-15.
8. Click
(
Close
)
.

Table of Contents