9. When the Standby Generator System is in use, the
Landing Gear must be extended manually.
NORMAL PROCEDURES
In the Before Take-Off Check List the Standby Generator
TEST procedure follows the Magneto Check
1 Throttle · 1700 RPM
2 Battery and Alternator Switches OFF
NOTE
If either the BAT-GEN lights fail to illuminate, it
indicates a malfunction in that part of the system.
Check operation of components listed under
step "5" of EMERGENCY PROCEDURES to
ensure system is functioning properly.
3 Standby Generator Power ON-OFF. TEST Switch
TEST (Hold Momentarrly 1n Test Position. BAT-GEN
lights will illuminate.)
4 Standby Generator Power ON-OFF-TEST Switch-OFF
5 Battery and Alternator Switches ON
PERFORMANCE - No Change
Approved:
4of4
Chester A. Rembleske
Beech Aircraft Corporation
DOA CE-2
FAA Approved
Revised: September, 1978
PIN 35-590118-19