EasyManua.ls Logo

Beech Beechcraft Bonanza V35 - Page 296

Default Icon
362 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NORMAL PROCEDURES
PREFLIGHT
1. With engine operating, place propeller deice switch in
the ON position.
2. Check propeller deice system ammeter for reading of 20
to 24 amperes (2 blade), 30 to 34 amperes (3 blade).
IN FLIGHT
1 . Follow the placarded procedure to monitor electrical
load.
2. To place the system in operation, move propeller deice
switch to the ON position. The system will function auto-
matically until the switch is turned off.
CAUTION
The system is not to be operated continuously
due to its electrical load.
3. Propeller imbalance may be relieved by varying rpm.
Increase rpm briefly and return to desired setting, re-
peating if necessary.
PERFORMANCE No Change
4of4
Approved: ~
7
4 Jc j//4
-~ y Chester A. Rembleske
Beech Aircraft Corporation
DOA CE-2
FAA Approved
Revised: November, 1977
PIN 35-590118-25

Table of Contents