www.bodor.com/service@bodor
.com
Maintenance Points 3
Maintenance Points 4
Maintenance Points 5
Job Nature:Clean up the slag and dust of the waste trolley.
Interval: 8h/time.
Tools/Materials: cleaning cloth, air gun
Job description: Regularly clean up the slag and dust on the waste
trolley.
Job Nature:Removal of slags and dust on the protection plate.
Interval: 8h/time.
Tools/Materials: cleaning cloth, air gun
Job description:Regularly clean the slag and dust on the X-direction
anti-burning plate
Job Nature
:
Clean the dust, slag, etc. of the exhaust duct.
Interval: 500h/time.
Tools/Materials: cleaning cloth, air gun
Job description:Periodically clean up the slag and dust of the exhaust
pipe
Job Nature
:
Clean
Interval: 40h/time.
Tools/Materials: cleaning cloth
Job description: Remove the head shell and clean up the internal dust
and impurities.