EasyManua.ls Logo

Bodor i5 Series - Page 86

Bodor i5 Series
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.bodor.com/service@bodor
.com
85
Maintenance Points 2
Maintenance Points 3
Maintenance Points 4
Maintenance Points 5
Job NatureClean up the slag and dust of the waste trolley.
Interval: 8h/time.
Tools/Materials: cleaning cloth, air gun
Job description: Regularly clean up the slag and dust on the waste
trolley.
Job NatureRemoval of slags and dust on the protection plate.
Interval: 8h/time.
Tools/Materials: cleaning cloth, air gun
Job description:Regularly clean the slag and dust on the X-direction
anti-burning plate
Job Nature
Clean the dust, slag, etc. of the exhaust duct.
Interval: 500h/time.
Tools/Materials: cleaning cloth, air gun
Job description:Periodically clean up the slag and dust of the exhaust
pipe
Job Nature
Clean
Interval: 40h/time.
Tools/Materials: cleaning cloth
Job description: Remove the head shell and clean up the internal dust
and impurities.

Table of Contents

Related product manuals