EasyManua.ls Logo

BWT AQA perla XL - Connections

BWT AQA perla XL
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
60
EN
12
13
Routetheushingwaterhose(12)ataninclineto
thesewagesystemconnection(drain)andsecure
theendwiththexingmaterialsuppliedtoprevent
itappingaboutwhenunderpressure.
Attachtheoverowhose(18x24)totheoverow
(13).Secureitwithcabletiesandrouteitwithan
incline of at least 10 cm to the sewage system
connection(drain).
The two hoses connected to the sewage system
may not be connected or constricted at any point.
InaccordancewithEN1717,theushingwaterand
overowhosesmustbeconnectedtothesewage
system at least 20 mm above the highest possible
wastewaterlevel(unimpededdrainage).
Placetheoorsensorontheoor.
6.2 Connections
Only the following connections are required on the
underside of the electronics housing:
Cover (2), remove the 2 large plastic screws,
lift up the flap with the electronics and hold it
securely.
Central instrumentation and control (CIC) sys-
tem,CIC connection (red RCA socket) for low
salt, etc.
Control connection for metering pumps (white
RCAsocket)
USB socket
Socket for blending equipment
> 20 mm

Table of Contents

Related product manuals